Start with I/O count, program complexity, motion and safety functions, network interfaces, environmental conditions and future expansion. S7-1200 / G2 is commonly considered for compact machines, while S7-1500 is evaluated for higher performance, larger architectures and advanced functions. The final CPU and modules must be confirmed as one compatible system.
Compare S7-1200 and S7-1500Enclosures · panels · Siemens automation
Choose the hardware.
Define the complete system.
Browse empty electrical enclosures, engineered control panels and Siemens automation families. Every enquiry is reviewed against dimensions, application data, article numbers, interfaces and export requirements before the quotation is finalized.
Common buyer searches
Answers before you choose a model.
These are the decisions most likely to change the article number, accessory list, replacement scope or panel design.
Send the full article number from the device label, including every letter, number and suffix, plus firmware or hardware version when visible. A family name such as G120 or S7-1500 is not enough because it can represent many electrical ratings, interfaces and lifecycle states.
See the verification workflowYes. A useful BOM review checks exact article numbers, quantities, generation compatibility, required accessories, obvious gaps and lifecycle status. Technical assumptions and substitutions should be shown separately before the commercial offer is approved.
View the engineering workflowProduct families
Start with what you are buying.
Choose an empty enclosure, a complete engineered panel or individual Siemens components. Each family page defines the series, parameters, selection inputs and technical boundary.

Industrial Electrical Enclosures
Empty floor-standing cabinets, wall-mounted boxes and operator consoles selected by size, environment and installation method.
- JP modular
- JS standalone
- JA compact
- JQ consoles

Custom Control Panels
Complete electrical assemblies with approved components, enclosure, wiring, documents and agreed functional checks.
- VFD panels
- PLC / HMI panels
- Motor starters
- Pump / fan panels

PLC & Distributed I/O
Controllers and distributed I/O for compact machines, modular systems and plant automation.
- S7-1200
- S7-1500
- ET 200

Variable Frequency Drives
Drive platforms for pumps, fans, conveyors, machinery and demanding motion applications.
- V20
- G120
- S120

Operator Panels
Visualization platforms for machine operation, diagnostics, alarms and modernization.
- Basic
- Unified Basic
- Unified Comfort

Motor Control & Protection
Coordinated switching, motor protection and reduced-stress starting components.
- Contactors
- Protection
- Soft starters

Industrial Power Supplies
Regulated DC power, buffering and selectivity solutions for automation systems.
- PSU4200
- PSU6200
- DC UPS

Industrial Communication
Network and identification products for connected machines and production systems.
- SCALANCE X
- SCALANCE M / S
- SIMATIC RF
Product selection answers
Questions buyers ask before choosing a part number.
Use these answers to narrow the product family, understand replacement risk and prepare a quotation that can be checked technically.
Identify the right Siemens product
Start with function, installed base and the complete article number.
Which Siemens PLC should I use for a new machine?
Start with I/O count, program complexity, motion and safety functions, network interfaces, environmental conditions and future expansion. S7-1200 / G2 is commonly considered for compact machines, while S7-1500 is evaluated for higher performance, larger architectures and advanced functions. The final CPU and modules must be confirmed as one compatible system.
Compare S7-1200 and S7-1500How do I identify an exact Siemens spare part?
Send the full article number from the device label, including every letter, number and suffix, plus firmware or hardware version when visible. A family name such as G120 or S7-1500 is not enough because it can represent many electrical ratings, interfaces and lifecycle states.
See the verification workflowCan Honghao review a mixed Siemens automation BOM?
Yes. A useful BOM review checks exact article numbers, quantities, generation compatibility, required accessories, obvious gaps and lifecycle status. Technical assumptions and substitutions should be shown separately before the commercial offer is approved.
View the engineering workflowReplace or migrate installed equipment
A successor model is an engineering change, not only a purchasing change.
Can an obsolete Siemens PLC be replaced one-for-one?
Sometimes the physical and electrical interfaces are close, but CPU behavior, I/O modules, memory, communication, software version and safety functions can still change. A migration review should map hardware, source projects, networks, wiring and acceptance tests before shutdown.
Review the migration scopeWhat is needed to replace a Siemens HMI panel?
Provide the full old and proposed article numbers, mounting cut-out, screen size, PLC protocol, existing project backup, engineering software version and required functions. Hardware availability alone does not prove that the old HMI project will convert without engineering work.
Explore SIMATIC HMI familiesHow should a drive replacement be checked?
Compare input supply, motor current, overload duty, control method, I/O, fieldbus, braking, EMC accessories, enclosure losses, cable length and parameter backup. The new drive must be validated against the driven load—not selected only by matching kW.
Review SINAMICS selection inputsSelect a control method
The process duty determines whether you need components or an engineered system.
Should I use a soft starter or a variable frequency drive?
Use a soft starter when the motor normally runs at fixed speed and the main objective is a controlled start or stop. Evaluate a VFD when variable speed, process control, energy optimization or wider torque control is required. Load torque, starts per hour, bypass and harmonic considerations affect the final decision.
Compare starting methodsWhen is SINAMICS V20 a better fit than G120?
V20 is typically evaluated for straightforward basic-performance applications. G120 is considered when modular configuration, broader communication, safety functions or a more demanding application architecture is needed. Ratings and options must be checked by exact article number.
Open the drive comparisonWhen do I need distributed I/O instead of central I/O?
Distributed I/O becomes useful when signals are physically spread across a machine or plant and shorter field wiring, modular expansion or remote diagnostics improve the architecture. Network availability, cabinet locations, environment, fail behavior and maintenance access should be reviewed first.
Review the ET 200 selection pageBuy for an export project
The quotation should define product identity, documents and project boundary.
What should be included in a Siemens automation export quotation?
It should identify the legal supplier, exact article numbers, quantities, included accessories, technical assumptions, lifecycle or substitution notes, lead-time basis, Incoterm, destination, packing, documents, warranty basis and exclusions. Engineered panels also need an agreed drawing and test scope.
Use the supplier checklistWhich documents can be supplied with an industrial control panel?
The project can define an approved BOM, general arrangement, schematics, terminal plan, parameter schedule, FAT record, as-built package, packing list and agreed commercial export documents. Certification or a standard claim is included only when explicitly supported by the contracted scope.
See the document checklistHow does Honghao handle product authenticity and specification risk?
Honghao records the full article number, confirms the quoted configuration against current manufacturer information and separates approved substitutions from the original BOM. Manufacturer authorization, certificates or special traceability are never implied; they must be documented when required.
Read the review and quality basisNot sure which model?