Export enquiries · Foshan, China · UTC+8Send part number or BOM

About Honghao Automation

Industrial automation support.
Structured for export.

Honghao Automation Equipment Co., Ltd. is the dedicated international business for industrial enclosures, automation product supply, technical review and engineered control-panel projects from Foshan, China.

Industrial automation control panel with PLC, power supply and field wiring
INDUSTRY CONTEXT Control architecture, product identity and wiring scope are reviewed project by project.

Company profile

An export-focused identity with a practical engineering background

Honghao focuses on the international market under its own company name, commercial documents and contact workflow. The business is positioned for overseas OEMs, system integrators, maintenance teams and industrial procurement groups that need a technically clear response—not only a product list.

Our working scope grows from experience across industrial enclosures, automation systems, motor drives, low-voltage control, motion, sensing, communication products and system integration. For export projects, that knowledge is converted into dimensional and article-number review, controlled engineering inputs, documented decisions and a defined delivery boundary.

Honghao Automation Equipment Co., Ltd.
Building 4, Changui Fang, Chancheng District, Foshan, Guangdong, China

What Honghao supports

From an empty enclosure to a complete control system

Each enquiry starts with the information required to select, quote, integrate and deliver the requested equipment. Any missing data is recorded as a question or assumption.

01

Industrial enclosures

Modular, standalone, wall-mounted and operator-console enclosures are reviewed by material, dimensions, mounting space, IP target, cable entry and accessories.

02

Siemens product supply

PLCs, HMIs, drives, motor-control, communication and power products are checked by complete article number, accessories, lifecycle and intended use.

03

Control-panel engineering

Defined projects may include VFD, PLC, motor-starting and custom control cabinets, with the agreed electrical design, assembly, inspection and documentation boundary.

04

Export-ready handover

Quotation scope can identify packing, marks, document list, Incoterm, shipping coordination and the responsibilities that remain with the consignee or installation site.

Engineering context

The work behind a professional automation quotation

Product identity, electrical design, assembly evidence and acceptance criteria must connect to the same released scope.

Technician carrying out electrical checks inside a control panel
Inspection disciplineRepresentative industry image. The actual inspection and FAT scope is defined in the quotation.
Illustrative Honghao engineered control panel family
Engineered control panelsVFD, PLC, motor-starting and custom cabinet configurations for approved project requirements.

Working method

Six checkpoints from enquiry to handover

The sequence is adapted to product-only orders and engineered-panel projects. Contracted deliverables always take precedence over a generic process description.

  1. 01

    Requirement capture

    Application, load, supply, environment, interfaces, destination and acceptance requirements.

  2. 02

    Technical review

    Article numbers, BOM structure, options, accessories, assumptions and open questions.

  3. 03

    Scope release

    Products, engineering deliverables, drawings, software, tests, documents and exclusions.

  4. 04

    Supply or integration

    Procurement and, when contracted, panel assembly against the released technical baseline.

  5. 05

    Inspection and FAT

    Agreed visual, wiring, electrical and functional checks with recorded deviations and results.

  6. 06

    Export handover

    Approved packing, document package and shipping coordination under the stated delivery basis.

Trust through boundaries

We separate documented facts from marketing language.

Authorization, origin, product condition, certification, inventory, test coverage and project compliance are not assumed from a logo or website statement. When required, they are checked against order-specific evidence.

  • Full article numbers and quantities
  • Approved alternatives and revisions
  • Included drawings, tests and records
  • Packing, shipping and site boundary
Review our transparency policy

Start with technical data

Send the BOM, application, destination and required evidence.

Start an RFQ